The U.S. Army Corps of Engineers used our breakwater rock in Oswego Harbor on Lake Ontario in 2016. This project was a Corps project in Oswego Harbor on Lake Ontario.

Materials

60,000 tons of Breakwater Rock (8 to 18 ton pieces)
TBD tons of Breakwater Rock (0.8 to 2.7 ton pieces and 12.5 to 20 ton pieces)

Highlights

60,000 tons of our granite Breakwater Rock was shipped by rail in 2016. This year, we started shipping a wider variety of sizes to Lake Ontario as part of the same project.